Factory acceptance standards for die-casting molds, cross-border procurement checklist
The factory acceptance of die casting molds is a key node in controlling quality. Written acceptance items can reduce cross-border trial mold disputes, and Xinfeng Machinery has organized universal acceptance verification dimensions.

1、 Acceptance of drawings, data, and material documents
The delivery package needs to include 3D/2D drawings, steel material certificates, heat treatment reports, and a list of vulnerable parts. Missing data is the most common point of disagreement in cross-border projects, with approximately 29% of after-sales disputes arising from incomplete delivery documents. An additional filling solidification simulation report is required for the alloy wheel mold, which records the parameters of the sprue and cooling scheme for the customer's subsequent process debugging. All files are labeled with version numbers, and the final effective drawings are locked to avoid version confusion.

2、 Dimensions, tolerances, and appearance inspection of the mold cavity
The dimensions of the cavity are compared with the drawing using three coordinates and calipers, and the appearance surface is free of bumps, sand holes, scratches, and repair welding marks. The roughness control of the appearance mirror wheel hub cavity is Ra0.02-Ra0.05 μ m, and the ordinary die-casting shell cavity is within Ra0.8 μ m. Focus on checking the fillet, sealing position, and exhaust groove depth. Exceeding the tolerance of exhaust groove depth can directly cause batch burrs, while insufficient depth can induce porosity defects.

3、 Acceptance of mold clamping, guidance, and motion components
Multiple opening and closing tests have been conducted on the guide column, guide sleeve, ejector pin, and slider movements, ensuring smooth operation without any jamming or abnormal noise. After the mold is closed, the parting surface is evenly adhered, and there are no obvious gaps in the light transmission inspection. The bonding gap of the slider sealing surface is controlled within 0.01mm. After the die and mold assembly is completed, the ejection stroke, reset signal, and limit switch are all debugged in place, and the oil and water circuit interfaces are marked accordingly.

4、 Waterway, sealing and pressure resistance testing
Cooling water circuit water pressure test, with a conventional water pressure of 0.6-0.8MPa and holding for 15 minutes, without leakage or blockage. Low pressure casting molds require separate pressure testing of the liquid lifting tube and sealing components, and seal leakage can cause aluminum leakage and unstable pressure. Clear identification of waterway inlet and outlet to prevent reverse connection on site, which can cause local hotspots and accelerated thermal fatigue cracking.

5、 Trial sample and defect judgment acceptance
Perform appearance, size, X-ray inspection, and air tightness sampling on the factory trial samples, and keep the samples for archiving. One trial of reaching the standard does not mean permanent stability. The key to acceptance is the compliance of mold structure, cooling, and exhaust design. The emphasis of metal injection mold acceptance varies, with a focus on verifying the size of the shrinkage compensation cavity and the smoothness of the feeding channel. Google's "die casting mold inspection checklist" is a high-frequency search term for overseas quality engineers.

FAQ
How to deal with unqualified acceptance? Record the problem list, the supplier shall conduct repair and re inspection, and major structural defects require reprocessing of the mold cavity.

Who will bear the cost of three-dimensional detection? Routine factory acceptance testing is the responsibility of the supplier, and third-party retesting by the customer is generally negotiated separately.

What is the allowable tolerance for the depth of the exhaust groove? The tolerance of the die-casting exhaust groove is ± 0.01mm, and the depth control tolerance is very small.

Do low pressure wheel hub molds require inspection samples for acceptance? The X-ray inspection of A356 safety wheel hub components and factory test modules is a routine acceptance item.

Can water leakage be repaired on-site through welding during water pressure testing? Minor sand holes can be welded and retested, and priority should be given to replacing waterway fittings for multiple leaks.

What is the standard clearance for the guide column and guide sleeve? Conventional single-sided clearance of 0.01-0.02mm, with reserved thermal expansion allowance for high temperature conditions.

How long is the acceptance cycle usually? Simple die-casting mold takes 1-2 days; The complete acceptance of the patterned wheel hub mold takes 2-4 days.

What is the biggest difference between MIM mold acceptance and die-casting mold? Key verification of sintering shrinkage compensation dimensions, micro gates, and exhaust structures.

Página web: https://es.zj-xinfeng.com/news/1406.html
No puedo encontrar ningún contenido

Get a Custom Product Proposal Online

Please fill out the form below to receive this for free.

Global Hotline:

+86-15356852630,13967513266

MOLDES DE FUNDICIÓN A BAJA PRESIÓN (LPDC) 
MOLDES DE FUNDICIÓN POR GRAVEDAD 
MOLDES DE FUNDICIÓN POR CONTRAPRESIÓN (CPC) 
MOLDES DE FUNDICIÓN DE PIEZAS ESTRUCTURALES
MOLDE DE FUNDICIÓN PARA CUBOS DE RUEDA DE MOTOCICLETA
MOLDE DE FUNDICIÓN POR PRESIÓN DIFERENCIAL PARA CUBOS DE RUEDA
MOLDE DE FUNDICIÓN POR GRAVEDAD PARA CUBOS DE RUEDA
MOLDE DE FUNDICIÓN A BAJA PRESIÓN PARA CUBOS DE RUEDA

MOLDES PARA LLANTAS DE AUTOMÓVIL 
PIEZAS ESTRUCTURALES PARA AUTOMÓVILES 
OTROS COMPONENTES DE FUNDICIÓN DE ALUMINIO

NOTICIAS DE LA EMPRESA
NOTICIAS DEL SECTOR
BLOG TÉCNICO
PREGUNTAS FRECUENTES

NOTICIAS DE LA EMPRESA
NOTICIAS DEL SECTOR
BLOG TÉCNICO
PREGUNTAS FRECUENTES PERFIL DE LA EMPRESA
ESTRUCTURA ORGANIZATIVA
HISTORIA DE LA EMPRESA
PROPIEDAD INTELECTUAL
ESPÍRITU DE EQUIPO SOCIOS

Copyright © Zhejiang Xinfeng Machinery Co., Ltd. Todos los derechos reservados.